Building Facilities


School Accessibility
Accessibility Status: Functionally Accessible

For additional information please contact the custodian or the school.

Office of Program Accessibility
Data Refresh: As Needed
Additional Data Provided by: Urban Assembly School of Design and Construction, The
Building Condition and Assessment Survey
Primary Building PARK WEST HS (ECF) - MANHATTAN, 525 WEST 50TH STREET
Architectural  Electrical  Mechanical
 
 Building Condition and Assessment Survey (BCAS) Ratings Key
Data Provided by: School Construction Authority
Data Refresh: As Needed
Annual Facilities Survey
Data Provided by: School Construction Authority
Data Refresh: Yearly
Department of Health Report
DateViolation CodeExplanationCorrective ActionRemarks
10/9/200904AFPC was not held by employee at the time of inspection.FPC was held the following day. Not resolved
10/9/200904AFPC was not held by employee at the time of inspection.FPC was held the following day. Not resolved
10/9/200904KMetal stem-type thermometer was not provided for cooking, cooling, reheating and holding.Thermometer was provided immediately. Resolved
10/9/200905DNo sink provided for hand washing in or near the cafeteria.Custodian Notified. Not resolved
Data Provided by: Department of Health / Office of Food and Nutrition Services
Data Refresh: Nightly
Property of Urban Assembly School of Design and Construction, The
Powered by NYCDOE - DIIT